Sprinkler System at the New Production Facility
CLIENT DETAILS AND REQUIREMENTS
FVS were contracted to install sprinkler protection to the new converting line process building at Flintshire Paper Mill, North Wales. This company have been a long standing client with FVS Limited for over thirty year and the maintenance of the new protection continued in line with existing contract to provide maintenance to existing sprinkler control equipment.
Specification
New sprinkler protection was designed and calculated to suit new production hall in accordance with FM (Factory Mutual) Data Sheets 3-26, protection Hazard Category 2/3 (HC2 & HC3) to provide 8/12mm/min over 230m². Provide necessary ancillary work to existing rooms, buildings and system. Provide new, FM Approved hose reel system. Decommission and remove existing sprinkler protection and modify existing alarm valve manifold and provide connection for a second alarm valve and necessary check valve.
Installation Work
New pre-fabricated sprinkler mains and distribution pipework was installed in accordance with design drawings to; CL3 Converting Production Hall with gridded range pipes with sprinkler heads supplied of rise from distribution pipe. Forklift truck corridor and Dispatch Area with terminal range pipes with sprinkler heads supplied off rise from distribution pipe. Underside & above Mezzanine, Plant Platforms and Below Duct, Reel Unwind Machine and Dust & Waste Handling with terminal range pipes with sprinkler heads supplied directly from range pipe, inclusive of fittings and brackets. New steel pipework was finished in red oxide and supported by M150-32mm steel filbows, M12-10mm threaded bar, nuts, purlin clips, 40 x 40mm slotted unistrut and window brackets, fastened to buildings steel support and purlin beams. 479No. 20mm, K115, Standard Response, 68°C, Spray Upright, FM Approved sprinkler heads were installed and a new 150mm, FM approved, wet alarm valve, isolation valve, pressure gauges and trim pipework fitted. New sprinkler protection was installed to existing warehouse and existing alarm valve was replaced with 200mm, FM Approved, wet alarms valve and all ancillary equipment.
New Hose Reel system installed to production facility consisting of; 11No. FM Approved 25ø x 30mm fixed rigid fire hose reels, 50ø galvanised ring main run at high / low level, 80mm FM approved check valve, isolation valve, pressure gauges and trim pipework and 80mm FM Approved pressure reducing valve.
Liaising with the contractor and our client’s site representatives, FVS engineers worked safely on site, following safe systems of work as outlined on risk assessments and method statements, and adhering to site rules at all times. Working alongside other contractors and around installed machinery and equipment, all work was carried out by competent engineers using hand held tools, 110V power tools, floor mounted screwing machine and utilising correct PPE. Working at high level was achieved via the use of a scissors lift.
Project was completed on time, in budget and to client satisfaction. Testing, commissioning and handover accomplished with full set of O&M Instructions issued along with necessary completion certification.
Care and Maintenance of the Sprinkler System
FVS have carried out the planned and reactive maintenance of the sprinkler equipment at Kimberly Clark for over thirty years and the planned maintenance of the new system was catered for along with the existing equipment.
Project Manager
The Project Manager stated he had been more than happy with FVS Limited, Gareth did an excellent job, he was very responsive, he had no issues with the quality of work provided by FVS, especially compared to some other fire protection contractors. He believes that due to that fact that we were a bit smaller than others we could be most responsive, Gareth was fantastic and he would have absolutely no issues recommending us in the future.
EMEA Engineering- Contractor
Following the new installation, an email was sent by the Engineering Manager to praise our excellent standards of workmanship. He stated ‘All individuals I worked directly with were very competent and professional at all times with a very high regard for working safely on our site and following specific site rules. The project was a fast track project with many companies working very closely together to achieve the overall timeline. Throughout the project, Fire Valve Services met all deadlines and were extremely flexible when asked to change plans at very short notice. I was also very impressed with the technical file documentation provided by Fire Valve Services at the end of the project. Fire Valve Services are a preferred vendor at the Flint and Barrow Mill and I personally would use them again on future major capital projects.’

New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility 
New Production Facility
NEXT PROJECT
Share
Subscribe
Get Our Newsletter
Join our list for any latest important updates. We don't share your data